Wolf to pounce on GR bond

TROUBLED tungsten and tin miner Wolf Minerals says it has decided to “recover” the costs of fixing an issue with its Drakelands plant in England by utilising the £7.5 million performance bond posted by GR Engineering Services.

Wolf to pounce on GR bond Wolf to pounce on GR bond Wolf to pounce on GR bond Wolf to pounce on GR bond Wolf to pounce on GR bond

Wolf wants to reduce noise emissions from the operation including low frequency noise (LFN), with the company voluntarily shutting down the vibrating screens in the processing plant on weekends in