EXPLORATION & DEVELOPMENT

Bellevue extends new discovery

NEW hits at Bellevue Gold’s Marceline discovery at Bellevue in Western Australia have extended the known strike length to 500m.

Bellevue extends new discovery

New results included 4.8m at 20.1 grams per tonne gold, including 0.9m at 102.7gpt gold from 489.4m; 2.1m at 45.5gpt gold from 503.4m; 4.2m at 21gpt gold from 459m; 4m at 16.7gpt gold from 455.7m; 4.9m at 13gpt gold from 462.1m; 1.2m at 45.1gpt gold from 479.4m; 8.2m at 6gpt gold from 379.8m; and 3.5m at 12.1gpt gold from 459.9m.

Mineralisation remains open in every direction.

"These latest results, with grades of more than 20gpt, show that Marceline is a significant discovery in its own right," Bellevue managing director Steve Parsons said.

"But given the scope to leverage the planned and existing infrastructure at Bellevue, Marceline has the potential to contribute to the production profile and mine life estimates in the stage two feasibility study.

"One of the main benefits being that A$10 million of capital has already been costed in the stage one study and any additional ounces coming into the mine plan from the Marceline Lode are expected to benefit from a lower level of capital intensity."

Bellevue is aiming to define a maiden resource for Marceline to underpin the stage two study due for release in the June quarter.

"With further infill required to round out the 500m of defined strike, and mineralisation remaining open to the north and down dip, Marceline is currently around half the size of Deacon, or circa 300,000oz," Argonaut Securities said.

"Argonaut expects increased resource/reserve drilling as Bellevue transitions to more cost-effective underground diamond drilling as mine rehabilitation progresses."

As per the stage one feasibility study released last month, Bellevue has forecast capital costs of A$255 million for a 750,000 tonne per annum, 7.4-year operation to produce an average 151,000 ounces per annum of gold at all-in sustaining costs of $1079 an ounce.

The production rate, which includes output of 160,000ozpa in years 1-5, is based on a maiden probable reserve of 2.7Mt at 8gpt gold for 690,000oz, using a cut-off grade price of $1750/oz.

The project has a post-tax net present value of $600 million and internal rate of return of 35%.

The stage two study will look to firm up those figures.

Shares in Bellevue rose 4.2% to 80.7c, the highest since the stage one study was released in February.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining News Intelligence team.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining News Intelligence team.

editions

MiningNews.net Research Report 2024

Access a multi-pronged tool to identify critical risks and opportunities in Australia’s mining industry.

editions

Mining Journal Intelligence Investor Sentiment Report 2024

Survey revealing the plans, priorities, and preferences of 120+ mining investors and their expectations for the sector in 2024.

editions

Mining Journal Intelligence Mining Equities Report 2023

Access an exclusive, inside look on the quarterly mining IPOs and secondary raisings data and mining equities performance tables with an annual Stock Exchange Comparisons supplement.

editions

Mining Journal Intelligence World Risk Report 2023 (feat. MineHutte ratings)

A detailed analysis of mining investment risks across 121 jurisdictions globally, built on 11 ‘hard risk’ metrics and an industrywide survey.