Production, costs down for Perilya

AS PERILYA prepares to go through with a $A45.5 million deal with China’s third-largest zinc producer, the miner has posted lower production rates from its Broken Hill operations as it pursues a lower tonnage, higher grade mining plan.

Production, costs down for Perilya Production, costs down for Perilya Production, costs down for Perilya Production, costs down for Perilya Production, costs down for Perilya

The company today revealed its total lead and zinc production for the three months to December 31 came to 25,800 tonnes of contained metal.

loader